
Technology |
MS polymer adhesive |
Coverage |
~20 m² per 10L (with correct trowel) |
Application |
5°C–40°C |
Cleanup |
Damp cloth (before curing) |
Selleys provides a complete Timber Flooring System that guarantees your timber floor installation is done correctly the first time. Proper subfloor preparation is essential for ensuring the longevity of your new flooring. Refer to the reverse page for detail on the Selleys Timber Flooring System products.

Share
Share this Product with your friends